Big Creek Greenway Extension – $10,200,000
The project consist of a 2 mile multi-use concrete trail that includes elevated super structure boardwalks, 70’ clear span pedestrian bridge, top down elevated boardwalk construction, stream crossings, retaining walls, pre-cast concrete tunnel under Windward Parkway and associated clearing, grading, erosion control, landscaping, and site amenities.