Fox Creek Golf Course Lake Rehabilitation – $486,000
In November 2016, ICAN was awarded the Fox Creek Lake renovation. With a nonfunctional OCS, ICAN will remove and replace the entire pipe system for the facility, as well as the overflow.
The project consist of:
- Demolition
- Erosion Control
- Grading
- Dredging
- Outlet control piping
- CIP Concrete
- Asphalt Cart Paths
- DOT Haul roads
- Asphalt Roadway
- Landscaping
- Reinforced Turf