Murphey Chandler Bridge – $260,000
In May of 2016, ICAN was selected to replace and construct a damaged bridge connecting the trail system at Murphey Chandler Park.
Project consist of:
- Removal of Existing 120 foot Pedestrian Bridge
- Helical Deep Foundation System
- Abutments
- New 120 foot Steel Pedestrian Bridge
- Concrete Trail
- Erosion Control
- Granite Retaining Walls