Willeo Trail Bull Sluice Phase – $2,500,000
In September of 2015, ICAN was selected to construct the Willeo Trail Bull Sluice. With a project value over 2.5 million, the City of Roswell looks for this to be a signature project in the southeast.
The Project consist of:
- 3200 LF of elevated boardwalk over flood waters of the Chattahoochee River
- Helical Piers
- 40 Foot Steel Bridge
- Overlooks
- Pavilion
- Concrete Trails
- Erosion Control
- Silt Curtains